The number of gritting routes across the Isle of Wight could be reduced from 6 to just 4 under council savings proposals, which would leave just 33% of the road network gritted in the winter months.
The Isle of Wight Council is considering reducing the extent of its winter road treatment network in a bid to save up to £80,000 annually.
Under the first option set out in the authority’s Savings and Transformation Plan, the number of gritting routes would fall from 6 to 4. The proportion of the highway network receiving winter treatment would be reduced from 40% to 33%, with 2 gritters removed from the fleet.
The proposal would also see an existing 6 cubic metre gritter replaced by a larger 9 cubic metre vehicle.
An alternative option would reduce the number of routes from 6 to 5 and remove just 1 gritter from the fleet, generating a smaller annual saving of £40,000.
Both options would reduce the treated road network to 33%.
The document warns that reducing winter maintenance would represent a loss of service and could increase the number of road collisions, damage to street furniture and potential injuries.
The first option specifically warns that roads could be closed as a result of weather events.
Both proposals would require a full route optimisation exercise to establish how the anticipated savings could be delivered.
The proposals form part of the council’s emerging budget for 2027/28 and will be considered by the Policy, Finance and Resources Committee on Thursday (19th November). No decision has yet been taken to reduce the winter gritting network, but a final decision is expected to be taken in February 2027.
The gritting cuts are among several savings proposals being considered by the council, with Island Echo previously revealing plans to switch off street lights between 01:00 and 05:00 to save £38,000 annually.



















































































